PRESS RELEASE - CTH H TO JUNEAU COUNTY LINE - CTH HH - SAFETY PROJECT

Project ID: 5899-00-30/60
Reedsburg – Lyndon Station
CTH H to Juneau County Line
CTH HH
Sauk County

PROJECT INFORMATION

The Sauk County Highway Department is proposing to improve the safety of approximately 3.5
miles of CTH HH from CTH H to the Juneau County Line. See the attached project location map.
There have been a high number of crashes along this section of roadway. The run-off the road
crash rate for this section of CTH HH is 168 crashes per hundred million vehicle miles traveled
(HMVMT). The run-off the road crash rate with severity K (fatality), A (incapacitating injury), or
B (non-incapacitating injury) is 45 crashes per HMVMT.

Proposed improvements include:
1) Installing grooved epoxy edgeline pavement markings
2) Installing centerline rumble strips
3) Installing specified horizontal curve warning signs
4) Paving the inside and outside shoulders of specific horizontal curves

PROPOSED TRAFFIC IMPACTS

Construction is currently scheduled to begin in the Spring/Summer of 2024 and is expected to be
completed within 4-5 weeks.

CTH HH will remain open to thru traffic during construction through the use of flagging
operations. Temporary driveway closures may be necessary during parts of the construction
process. Construction staff will contact homeowners and businesses in advance before closing a
driveway. If you have special access needs during construction please let us know so these can
be considered as much as possible and, if needed, included in the bidding documents.

REAL ESTATE

No real estate acquisitions are anticipated for this project.

ANTICIPATED SCHEDULE

Preliminary Design Complete: September 2021
Environmental Review Complete: November 2021
Final Design Complete: June 2023
Bid Date: February 2024
Construction: Spring/Summer 2024

PUBLIC INPUT/COMMENTS

We encourage you to talk to the project representatives and ask them questions. Your comments
assist us in developing a project that will serve the needs of the traveling public as well as the
needs of the local community. Your input is welcome and appreciated throughout the design
process.

CONTACTS

                                    Patrick Gavinski                                             Dan Tracy, P.E.
                                    Sauk County Highway Commissioner       Jewell Associates Engineers, Inc.
                                    (608) 355-4855                                              (608) 588-7484